Edgerton Teen Center's Blog

life's an adventure...live it!

Sunday, September 16, 2012

Posted by Edgerton Teen Center at 5:32 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

About Me

My photo
Edgerton Teen Center
View my complete profile

Blog Archive

  • ►  2013 (2)
    • ►  August (2)
  • ▼  2012 (359)
    • ►  December (15)
    • ►  November (38)
    • ►  October (38)
    • ▼  September (65)
      • More doors are installed. Dave is able to use doo...
      • Tom McShane laying out stair risers.
      • Tom McShane removing floor joists for the stairwel...
      • Deegans Hardware donated caulk. Thank you!
      • No title
      • New walls at the stairwell tower.
      • Tom is framing walls everywhere. All for the stai...
      • More drywall and doors.
      • No title
      • No title
      • Tom McShane working on the stairwell tower.
      • No title
      • Lights are awesome.
      • Ladies room has heat!
      • Working on the furnace.
      • Lights are everywhere with a flip of a switch.
      • No title
      • New walls with drywall.
      • John Sill and Keith Lund framed two walls, a l6 ft...
      • Keith Lund.
      • John Sill hard at work.
      • Ladies room.
      • John Sill framing walls for the utility room and c...
      • Edgerton High School football team in the Edgerton...
      • Edgerton Homecoming Parade.
      • Edgerton Homecoming Parade.
      • Edgerton Homecoming Parade.
      • Edgerton Homecoming Parade.
      • Edgerton Homecoming Parade.
      • Edgerton Homecoming Parade.
      • The floor is in and all painting in the girls rest...
      • No title
      • No title
      • No title
      • Tom McShane working on the stairwell tower.
      • With conduit now on the ceiling...we paint.
      • Painting the ceiling at the teen center.
      • No title
      • First coat of paint on the ceiling.
      • No title
      • No title
      • Teen Center windows decorated for Homecoming.
      • Edgerton Homecoming.
      • Edgerton Homecoming.
      • Hallway dryall.
      • Thank you to the deputies who bring the Workenders.
      • Washing the top of the wall.
      • No title
      • No title
      • Priming the newly finished drywall in the new rest...
      • A birds eye view of the cafe and proposed stage-th...
      • Keith Lund finishes nailing the last board on the ...
      • The Workender crew.
      • An old soffit was removed. Insulation can now be ...
      • Cleaning brick.
      • Tuck pointing and mortar work being done.
      • Rosemary Williams a volunteer and board member was...
      • Toni teen center Flood cleaning brick at the teen ...
      • Keith Lund and Jay Williams volunteered time to dr...
      • Oh how far weve come! Faithful volunteers are mak...
      • 40 sheets of drywalk await installation.
      • One restroom is almost completely covered with dry...
      • Drywall is going up at the teen center.
      • Dalton
      • Keith Lund installing drywall in the brand new res...
    • ►  August (46)
    • ►  July (34)
    • ►  June (28)
    • ►  May (31)
    • ►  April (12)
    • ►  March (12)
    • ►  February (11)
    • ►  January (29)
  • ►  2011 (167)
    • ►  December (57)
    • ►  November (17)
    • ►  October (28)
    • ►  September (21)
    • ►  August (31)
    • ►  July (1)
    • ►  April (1)
    • ►  March (3)
    • ►  February (2)
    • ►  January (6)
  • ►  2010 (49)
    • ►  December (10)
    • ►  November (1)
    • ►  October (4)
    • ►  September (7)
    • ►  July (3)
    • ►  May (18)
    • ►  March (1)
    • ►  February (5)
  • ►  2009 (27)
    • ►  November (2)
    • ►  August (7)
    • ►  July (7)
    • ►  June (1)
    • ►  May (2)
    • ►  March (2)
    • ►  January (6)
  • ►  2008 (25)
    • ►  December (10)
    • ►  November (4)
    • ►  September (1)
    • ►  August (1)
    • ►  July (1)
    • ►  May (2)
    • ►  April (6)
Awesome Inc. theme. Powered by Blogger.