More doors are installed. Dave is able to use doors from the 2nd floor to finish off the lst floor. Recycle...Reduce and Reuse. We have saved a lot of money on this project by doing so.
Tom McShane laying out stair risers.
Thursday, September 27, 2012
Tom McShane removing floor joists for the stairwell tower.
Deegans Hardware donated caulk. Thank you!
Tuesday, September 25, 2012
New walls at the stairwell tower.
Tom is framing walls everywhere. All for the stairwell tower.
Monday, September 24, 2012
More drywall and doors.
Tom McShane working on the stairwell tower.
Sunday, September 23, 2012
Lights are awesome.
Ladies room has heat!
Working on the furnace.
Lights are everywhere with a flip of a switch.
New walls with drywall.
Saturday, September 22, 2012
John Sill and Keith Lund framed two walls, a l6 ft. header and ceiling rafters.
Keith Lund.
John Sill hard at work.
Ladies room.
John Sill framing walls for the utility room and closet.
Friday, September 21, 2012
Edgerton High School football team in the Edgerton Homecoming Parade.
Edgerton Homecoming Parade.
Edgerton Homecoming Parade.
Edgerton Homecoming Parade.
Edgerton Homecoming Parade.
Edgerton Homecoming Parade.
Edgerton Homecoming Parade.
The floor is in and all painting in the girls restroom. Trim and fixtures are all that remain.
Thursday, September 20, 2012
Tom McShane working on the stairwell tower.
Tuesday, September 18, 2012
With conduit now on the ceiling...we paint.
Painting the ceiling at the teen center.
First coat of paint on the ceiling.
Sunday, September 16, 2012
Teen Center windows decorated for Homecoming.
Edgerton Homecoming.
Edgerton Homecoming.
Hallway dryall.
Saturday, September 15, 2012
Thank you to the deputies who bring the Workenders.
Washing the top of the wall.
Priming the newly finished drywall in the new restrooms!